TB 1--1520--237-20--237
(1) TM 1-1520-237-23-3, paragraph 5-4-14.1.3, add the following note at the beginning of the
paragraph.
NOTE
On hub assemblies with part number beginning 70070-10046, a bolt is not installed at the 11
O'Clock position to attach the damper bracket.
(2) TM 1-1520-250-23-3, paragraph 5.8.4.3, add the following note at the beginning of the para-
graph.
NOTE
On hub assemblies with part number beginning 70070-10046, a bolt is not installed at the 11
O'Clock position to attach the damper bracket.
13. References.
a. DA PAM 738-751, 15 March 1999.
b. TM 1-1520-237-23.
c.
TM 1-1520-250-23.
d. TB 1-1520-237-20-235.
e. AR 200-1.
f.
AR 95-1.
14. Recording and Reporting Requirements.
NOTE
If the reporting requirements below in paragraphs 14.a.(1),(2), and 14.c.(1), (2) have already been
accomplished IAW UH-60-02-02, there are no further reporting requirements below.
a.
Aircraft:
(1) TAMMS Reporting Compliance Suspense.
Upon entering requirements of this TB on DA Form 2408-13-1 for all affected aircraft, Commanders will for-
ward a priority message, datafax or email to Commander, AMCOM, ATTN: AMSAM-SF-A (SOF Compliance
Officer), Redstone Arsenal, AL 35898-5000, IAW AR 95-1, NLT date specified in paragraph 3. Datafax num-
ber is DSN 897-2111 or commercial (256) 313-2111. Email address is "safeadm@redstone.army.mil". The
report will cite This TB number, date of entry in DA Form 2408-13-1, the aircraft mission design series and
serial numbers of aircraft in numerical order.
(2) Task/Inspection Reporting Suspense Date .
Upon completion of inspection, Commanders will forward a priority message to the Logistical Point of Contact
listed in paragraph 16.b.. The report will cite this TB number, date of the inspection, aircraft and component
serial number, aircraft and component hours, and results of the inspection IAW Paragraph 8.b. (each hub
will be identified as eligible or non-eligible). Assets not reported will not be eligible for rework. Provide an
AVUM level POC to include name, telephone number (DSN and commercial), and email address. Inspection
and reports will be completed NLT date specified in paragraph 2..
b. Wholesale Spare Parts/Assemblies. N/A.
c.
Retail Spare Parts/Assemblies.
(1) Reporting Message Receipt.
Commanders and facility managers will report receipt of this TB by email or FAX to the LOG POC listed in
(2) Task Inspection Reporting Suspense.
Commanders and facility managers will report inspection results to the LOG POC listed in paragraph 16.b.
NLT the date specified in paragraph 1.e.(2). Report by email or FAX and provide local POC.
7