d. Maintenance Trainers (Category A and B). Same as paragraph 1.a..
e. Component/Parts in Stock at All Levels (Depot Level and Others), including War Reserves. N/A.
f.
Components/Parts in Work (Depot Level and Others). N/A.
2. Task/Inspection Suspense Date. Complete the inspection IAW paragraph 8 prior to
next APU/Engine
start, but NLT 07 February 2002 and report IAW para 14.a.(2) NLT 11 February 2002.
3. TAMMS Reporting Compliance Suspense Date.
13 December 2001
4.
Summary of Problem.
a. During a post flight inspection, fuel was discovered beneath the APU. Further inspection revealed
a chaffed and ruptured fuel line at the APU shroud assembly. The chaffing was caused by an unauthorized
fabricated solid metal grommet securing the fuel lines to the shroud assembly. The reporting unit inspected
the remainder of their fleet with two additional discrepant grommets being located. Corpus Christie Army
Depot and some National Guard units have also found discrepant grommets in their fleets as well. The origin
of the fabricated grommets is unknown at this time.
c.
The purpose of this TB is to remove all unauthorized APU shroud assembly grommets from the fleet.
5.
End Items to be inspected. All H-60 series aircraft.
Assembly Components to be Inspected. N/A.
7.
Parts to be Inspected. -
NOMENCLATURE
PART NUMBER
NSN
Grommet, Tube Pass
169037-1
Tube Bundle
163180-100
Tube Bundle
160374-100
Fuel Line
3883497-1
Seal, Non-metallic
3615184-1
Nut, Plain, Plate
3615185-1
Shield, Heat, Turb.
70303-03023-041
2835-01-119-7426
Shield, Heat, Turb.
70303-03023-042
2835-01-120-0213
8. Inspection Procedures. Conduct visual inspection of
grommet at
the APU shroud assembly. Grom-
met should be composed of silicon rubber/fiberglass compound. Metal grommets are not authorized.
NOTE
Supplemental information (photos/graphics) for this inspection can be viewed at: (use lower case)
"www.redstone.army.mil/sof/suppl/u60s0204.pdf".
a. If an authorized grommet is installed, clear the red dash / / - / / entry from paragraph 1.a.. Compliance
with this TB is complete.
b. If an unauthorized grommet is installed, clear the red dash / / - / / entry from paragraph 1.a. and make
the following entry on the DA Form 2408-13-1. Enter a red / / X / / status symbol with the following statement:
"Grommet at APU shroud assembly requires replacement IAW TB 1-1520-237-20-242". Replace grommet
c. If an unauthorized grommet is found, inspect fuel lines at shroud assembly for signs of chaffing. If
chaffing is observed, make the following entry on the DA Form 2408-13-1. Enter a red / / X / / status symbol