TB 1--1520--237--20--231
(1) Inspection -- Total of 1.0 man--hour using 1 person.
(2) Correction -- Total of 2.0 man--hours using 1 person.
(3) Total of 2 hours downtime for one end item.
c.
Estimated cost impact to the field --
NOMENCLATURE
P/N / NSN
QTY
COST EA
TOTAL
LINK, SERVO
70410--02334--045
1
5.45
5.45
FLIGHT CONTROL
6616--01--281--4589
(1) Total Cost Per Aircraft (For 4)=
1.80
d. TB / MWOs to be applied prior to or concurrently with this inspection -- N/A
e. Publications which require change as a result of this inspection -- N/A
13.References. --
a. DA PAM 738--751, 15 Mar 99
b. TM 1--1500--328--23
c.
TM 1--1520--237--23
d. TM 1--1520--250--23
e. TM 1--1520--269--23 (IETM)
f.
DMWR 1--1560--290, July 2000
g. MIL STD 33540
14.Recording and Reporting Requirements. --
a. Reporting Compliance Suspense Date (Aircraft). Upon completion of inspection requirements con-
tained in this message for all subject MDS aircraft, Commanders will forward a priority message, datafax or
e-mail to Commander, AMCOM, ATTN: AMSAM--SF--A (SOF Compliance Officer), Redstone Arsenal, AL
35898--5000, IAW AR 95--1. Datafax number is DSN 897--2111 or commercial (256) 313--2111. e-mail ad-
dress is "safeadm@redstone.army.mil". Insection and reports will be complted NLT 9 April 01. The report
will cite TB and message number, date of entry in DA Form 2408--13--1, the aircraft mission design series
and serial numbers of aircraft in numerical order affected and completion of inspection/corrective actions.
b. Task/Inspection Reporting Suspense Date (Aircraft) -- Upon completion of inspection requirements,
Commanders will forward a priority message to the Logistics POC IAW paragraph 16b. The report will cite
TB number, date of inspection, aircraft serial number, aircraft and component hours, component serial num-
ber, part number, cage code, and unit POC with telphone number (DSN and Commercial) and results of the
inspection. Reports will be completed NLT 9 April 01.
c.
Reporting Message Receipt (Spares) -- N/A
d. Task/Inspection Reporting Suspense Date (Spares) --
(1) Material in Wholesale Depot storage -- Depot and Material Activity Commanders will report
compliance with this message to the wholesale material POC (Spares) listed in paragraph 16c NLT 6 April
01 on DD Form 1225. Provide the cost of compliance with this message to include an estimate of the cost
reimbersable funding required to move serviceable items on hand listed in paragraph 6 to a work area, unpack
the material, repack the material after inspection by AMCOM inspectors, and to return material to storage,
as appropriate. Report, by original serviceable condition code, the quantity of material placed in condition
code //J//. Report by e--mail or datafax and provide local point of contact.
(2) Material in Retail Storage -- Commanders and Facility Managers will report compliance with
this message to the Logistical POC in paragraph 16b NLT 6 April 01.
4