d. Disposition:
(1) Contact the LOG POC IAW paragraph 16.b. to determine disposition of defective/unservice-
able hubs that meet the paragraph 8 eligibility requirements but may be repairable.
(2) Use normal supply procedures to dispose of all defective/unserviceable items, to include un-
serviceable hubs that do not meet paragraph 8 and 9 eligibility requirements.
e. Disposition of Hazardous Material. IAW Environmental Protection Agency directives as imple-
mented by your servicing Environmental Coordinator (AR 200-1).
11. Special Tools, and Fixtures Required.. As required.
a. Category of Maintenance. AVUM . Aircraft downtime to accomplish the paragraph 8 inspection and
paragraph 9 hub replacement will be
charged to
AVUM maintenance. Report aircraft non-mission capable
maintenance (NMCM) while undergoing inspection and correction IAW this TB.
b. Estimated Time Required.
(1) Inspection; Total of 1 man-hour for one end item.
(2) Correction;
(a) Total of 100 man-hours using 3 persons.
(b) Total of 48 hours downtime for one end item.
c.
Estimated cost impact to the field. N/A
d. TB/MWOs to be applied prior to or concurrently with this inspection. N/A
e. Publications which require change as a result of this inspection. TM 1-1520-237-23 and TM
1-1520-250-23 shall be changed as follows: A copy of this TB shall be inserted in the appropriate Tm as au-
thority to implement the change until the printed change is received. TM 1-1520-237-23P, TM
1-1520-250-23P and DMWR 1-1615-376 will be revised with changes to be determined.